|
|
|
Reclaimed Water Project - Survey
The Engineering-Survey Department and private engineering firms are responsible for the survey of existing conditions located in the city's right-of-way.
Existing conditions includes:
- driveways
- sidewalks
- curbs
- fences
- utilities
- trees
- and any other obstruction that would determine the location of the proposed reclaimed water main.
|
|
|
This is the official site for the City of Pinellas Park, Florida, U.S.A.
This site best viewed with Microsoft Internet Explorer 4.0 or higher,
at a minimum screen resolution of 800 x 600.
|
|
|